-
-
-
Adjustable U- H...
U-Heads are designed to be used in conjunction with Adjustable System Scaffolding.
These jacks are adjustable and this is the biggest advantage of these products.
AED د.إ24 Retail PriceAdjustable U- H...
AED د.إ24 Retail Price -
Adjustable Base...
The Adjustable Base Jack is used with all scaffold systems and formwork systems.
The adjustable base is made of 4mm thick pipe, 38mm outer diameter with threading with rolling machine which has a nut restraint to ensure the stem always has a minimum engagement into the Standard of 150mm. The adjustable base jacks provide 500mm of thread adjustment.
We manufacture for our clients an unmatched range of adjustable base Jack. Due to its superior quality and long lasting performancem, this jack has multiple usage in almost all the scaffolding as well as formwork system. You can blindly rely on our product because of its durability and reliability.
AED د.إ30 Retail PriceAdjustable Base...
AED د.إ30 Retail Price -
Universal Jack...
At our state-of-the-art manufacturing unit, we manufacture for our clients an unmatched range of Universal Jacks under stringent quality control standards.
The universal jack provides a method of adjustment which can be used at either the top or bottom of a scaffolding support structure. It is used in conjunction with Forkeads and adaptors and can bear the full loading capacity of Cuplock when fully braced. It can be supplied with welded base plate or adjustable jack.
AED د.إ20 Retail PriceUniversal Jack...
AED د.إ20 Retail Price -
Base Plate...
Base Plates create a stable structure to construct safe scaffolding structures. The durable material ensures a strong, square, and level foundation for scaffolding.
The base plate fits into standard scaffold frames and is made from heavy-duty steel. These baseplates are designed for use in a variety of trades and jobsites and are weather resistant to withstand rough outdoor work conditions
AED د.إ19 Retail PriceBase Plate...
AED د.إ19 Retail Price -
Vertical Standa...
Made from 48.3mm diameter x 3.2mm thick grade steel tube, Cuplock System Standards (Vertucal) are formed by two cups a fixed bottom cup which is welded to standard (Vertical) at pre-located intervals i.e. 500mm and a sliding top cup. The forged blade ends of the ledger (Horizontal) are located into the bottom cup. The top cup is moved down and rotated to secure the components in place and tightened by a hammer blow to give a positive and rigfid connection.
AED د.إ0 – د.إ80 Retail PriceVertical Standa...
AED د.إ0 – د.إ80 Retail Price -
Ledger (Horizon...
Made from 48.3 mm diameter high grade steel tube with forged steel blade ends, which locate into the bottom cups of the Standard (Vertical) and are locked in place by the corresponding top cups.
AED د.إ17 – د.إ36 Retail PriceLedger (Horizon...
AED د.إ17 – د.إ36 Retail Price -
Cup Lock Interm...
Made from 48.3mm diameter high grade steel tube. Drop into place over the ledgers and are secured with a locking device to prevent movement. Act as a conventional transoms but extend beyond the inside ledger to provide intermediate support to one or two inside boards.
AED د.إ26 Retail PriceCup Lock Interm...
AED د.إ26 Retail Price -
Afton Decking B...
Decking Beams are designed with 100mm top flange which gives more support to the plywood. Tongue of the drop heads are inserted in the slots of the decking beam at both ends.
AED د.إ81 – د.إ121 Retail PriceAfton Decking B...
AED د.إ81 – د.إ121 Retail Price -
Infill Beam...
They are manufactured from 2mm thick top quality steel sheet and are designed to be used with the decking beams and are spaced out at predetermined centres to support the plywood.
AED د.إ35 – د.إ56 Retail PriceInfill Beam...
AED د.إ35 – د.إ56 Retail Price -
AFTON DECKING S...
The quick action drophead is designed to fit on standard props or adaptors for cuplock scaffolding. The primary head remains in contact with the concrete while the secondary head and its supporting wedge drop forged are released by a single hammer blow. The drophead has a load carrying capacity of 40kN.
AED د.إ46 Retail PriceAFTON DECKING S...
AED د.إ46 Retail Price -
Spigot...
Cuplock system scaffolding is simple, fast and easy to erect with only four component fastening. It is manufactured using 3.2mm high grade steel, Cuplock/cup system scaffolding is 20% lighter than standard 4mm scaffolding tubes. This type of scaffolding is extremely versatile with 500mm cup intervals on the verticals.
AED د.إ16 Retail PriceSpigot...
AED د.إ16 Retail Price -
-
-
-
-
-
-
Translate »